In the past couple of weeks Nigel and the lads have transformed the outbuildings which will become the kitchen (in an L-shape) of our house. Probably mentioned before (can’t remember) that the outbuildings (where previously animals lived and storage for loads of “stuff” is very low and I was banging my head on the cross-beams).
Well, while Nigel was away in the UK for a week the lads dug out the floor (to drop the final level), put the insulation in and set the drainage pipes in place. Last week they finished concreting and wow it makes the space look really big.







